
Convensa completes the excavation of the Viator tunnel for the future Murcia-Almería high-speed rail line (LAV)
READ MOREConvensa has completed the excavation of the Viator tunnel, on the Nijar-Río Andarax section, where the upper half has been excavated over a length of 878 metres. This is a key piece of infrastructure for the Mediterranean Corridor and the future Murcia-Almería high-speed rail line (LAV).